home *** CD-ROM | disk | FTP | other *** search
/ Tech Arsenal 1 / Tech Arsenal (Arsenal Computer).ISO / tek-19 / alps3.zip / FES.HLP < prev    next >
Text File  |  1990-12-13  |  1KB  |  18 lines

  1.               FURNITURE & EQUIPMENT
  2.  
  3.    This data file is for developing furniture & equipment
  4. data by operation.   It calls for more specific facility data
  5. by operation than the Layout Planning module.   This data is
  6. then used to cross reference the WSU file for matching Work
  7. Station Units to operations.   By doing this you have
  8. developed a description of each operation in relation to
  9. space and furniture/equipment requirements.   Input required
  10. is: Operation Name, Operation Number, Operation Square
  11. Footage, Operation Cost/Square Foot, Floor the Operation is
  12. on, Number of Different Equipment Item Numbers for the
  13. Operation, Equipment Item Number, Cost of that Item Number,
  14. and Quantity of that Item Number.   The cost information is
  15. used mostly in the Overhead Cost module, which must be
  16. purchased separately.
  17.  
  18.